17
150+
6,000+
Fluid properties in database
$1M+
Average cost of unplanned downtime per incident in mission-critical facilities
30%
Of cooling system failures trace back to hydraulic imbalance, a system-level problem that components alone can’t reveal
2-5x
Projected growth in data center cooling demand by 2030
Design assumptions go untested until commissioning, when finding problems is expensive and schedule-breaking.
STAGE I
STAGE II
STAGE III
STAGE IV
STAGE V
STAGE VI
Across design firms, EPCs, hyperscalers, semiconductor fabricators, and co-location operators, PIPE-FLO users consistently report fewer surprises at commissioning, faster design cycles, and a validated model they can present with confidence to clients and stakeholders.
Data center projects involve designers, contractors, owners, and operators who all need to understand system behavior. PIPE-FLO gives them a shared model rather than a chain of translated documents that loses fidelity at every step.